What a multiplex really costs.
Altus Group’s 2026 guide benchmarks GTA wood-frame residential hard costs at $210–$330 per square foot, excluding land, soft costs, financing and HST. ESTIMATE small infill multiplexes often land at $400–$600 per square foot all-in. Rebates and DC exemptions can recover part of that.
What are hard costs?
Hard costs are the physical build: excavation, foundation, framing, roofing, windows, mechanical, electrical, plumbing, fire separation, finishes and site work. Altus Group puts GTA wood-frame residential at $210–$330 per square foot in 2026. Small infill projects tend toward the top of that range or above because fixed costs spread over fewer square feet.
What are soft costs?
Soft costs cover architecture, engineering, surveys, zoning review, permit fees, insurance, legal, financing fees and interest, and project management. ESTIMATE on small multiplexes these often add 25–45% on top of hard costs. They are easy to underestimate, which is exactly why they go into the pro forma first.
Which costs are often missed?
Water and sewer upgrades, hydro service increases, sprinklers or fire separation, tree protection, underpinning a basement, temporary housing if you live there, and lease-up time. ESTIMATE any one of these can move a budget by tens of thousands of dollars. Our feasibility review lists each one for your lot.
How do rebates and exemptions change the math?
Toronto exempts development charges on units two to six for projects up to six units, and new rentals with four or more qualifying units may recover the federal GST. Together these can offset a meaningful share of soft costs. Confirm eligibility early, because unit count and tenure decide it.
Sources
- City of Toronto — Development charges overview
- Toronto By-law 845-2025 (DC and parkland exemptions)
- CRA — GST/HST rebate for purpose-built rental housing
- Altus Group — 2026 Canadian Cost Guide
Accessed Nov 16, 2026. General information, not legal, tax or financing advice.
