Feasibility review
5 homes · Toronto & GTA

Five homes. A different loan.

The fifth unit changes the financing conversation. Five units is where CMHC multi-unit insurance — including MLI Select — starts.

Where can I build a fiveplex in Toronto?

As of June 26, 2025, Zoning By-law 654-2025 permits five- and six-unit detached multiplexes as-of-right on Neighbourhoods-designated low-rise lots in Wards 4, 9, 10, 11, 12, 13, 14, 19 and 23. Elsewhere in Toronto the as-of-right cap is four units, so a fiveplex there requires a Committee of Adjustment application unless the ward opts in.

Why does the fifth unit matter for financing?

CMHC multi-unit mortgage loan insurance, including MLI Select, applies to properties with five or more units. For new construction, MLI Select can reach up to 95% loan-to-cost and amortizations up to 50 years at 100 points. Four units and under generally use residential lending instead. Confirm terms with a broker.

What is the catch with MLI Select?

You earn points by committing to affordability, energy efficiency or accessibility, and those commitments carry real costs or rent limits. Premiums are significant: after CMHC’s July 14, 2025 update, construction loans above 90% loan-to-value carry a 7.00% base premium before MLI Select discounts. Model it before you chase it.

Is a fiveplex or a sixplex better?

If your lot can carry six, the sixth unit usually adds rent faster than it adds cost, since land, foundation, roof and site work are shared. A fiveplex makes sense when the envelope, parking, servicing or budget caps the building. We model both on your lot before any drawings.

What does the Lot Feasibility Review tell me?

Whether a fiveplex actually works on your lot: what zoning allows, a cost range, a rent range, financing paths and rebates, and our recommendation. If something else on this list is the better move, we say so.

Deep dive

Where can you build a fiveplex in Toronto?

Five- and six-unit multiplexes are permitted in detached residential buildings on Neighbourhoods-designated lots in Toronto & East York (Wards 4, 9, 10, 11, 12, 13, 14 and 19) and Ward 23, under Zoning By-law 654-2025. Elsewhere in the city, six-unit permissions vary by location, so a fiveplex usually needs approval, typically a minor variance at the Committee of Adjustment.

Five is where financing changes

At five units you leave homeowner lending and enter CMHC’s multi-unit world. CMHC standard rental insurance requires at least five rental units, a property that is at least 70% residential, and a maximum loan-to-value of 85%. Amortization runs up to 50 years for new construction. Borrowers need proven experience, at least five years of multi-unit property management or a property manager with that record, plus a net worth of at least 25% of the loan.

MLI Select goes further for projects that score points on affordability, energy efficiency or accessibility. CMHC lists up to 95% loan-to-cost for new construction and longer amortizations at higher point tiers.

Underwriting: the building has to carry itself

Multi-unit lenders size the loan from the property’s rental income, measured as a debt coverage ratio, not from your personal income alone. That means your rents, operating costs and vacancy assumptions need to hold up on paper. Bad assumptions shrink the loan. We build the pro forma the way a lender reads it.

Fees and rebates at five units

  • Development charges: exempt on units two through six in Toronto projects of up to six units.
  • Parkland cash-in-lieu: exempt for units two through six under By-law 845-2025.
  • GST/HST: five self-contained rental units can qualify for the federal purpose-built rental rebate, with the provincial part rebated in Ontario where federal conditions are met.

What makes a fiveplex harder to build?

More households in one building raises the stakes on fire separation, exits, sound and services under the 2024 Building Code. Your design team confirms which parts of the Code apply to your building. Expect more engineering, more coordination and closer lender monitoring during construction. These are drivers, not reasons to stop, but they belong in the budget from day one.

The fiveplex process

  1. Check the zone. Look up your address on the City’s Interactive Zoning By-law Map. Multiplexes of two to four units are permitted in the R, RD, RS, RM and RT zones.
  2. Check the envelope. Height overlay, lot coverage overlay, setbacks and any Chapter 900 exception decide how big the building can be.
  3. Run the numbers. Build cost, soft costs, financing, rents and exit value, before a dollar goes into drawings.
  4. Design and engineer. Drawings, structure, mechanical and site servicing, prepared by qualified designers.
  5. Confirm zoning. Optional but recommended: a Zoning Applicable Law Certificate, so the permit application is complete on day one.
  6. Fix what doesn’t fit. If the design needs relief from zoning, apply for a minor variance at the Committee of Adjustment before the permit.
  7. Apply for the building permit through Toronto Building Online Services. Intake checks completeness, then an examiner reviews the plans.
  8. Build and inspect. Construction proceeds with City inspections at required stages.
  9. Occupy and lease. Final inspections, then tenants, a standard lease and a rent roll.

SIXPLEX projects of this type: [Project case studies & photos: TBD]

FAQ
Can my councillor opt my ward in?

Toronto allowed other wards to opt in. As of February 2026 reporting, no additional wards had. Check current status.

Is a fiveplex eligible for the GST/HST rebate?

It can be: the federal rebate needs four or more qualifying rental units. CRA conditions apply.

Is a fiveplex as-of-right in Toronto?

In the nine wards covered by By-law 654-2025 (Wards 4, 9–14, 19 and 23), in a detached building on a Neighbourhoods lot, yes, subject to zoning standards. Elsewhere, permissions vary and approval is usually needed.

Can I use MLI Select on a fiveplex?

Five units meets CMHC’s multi-unit minimum. MLI Select eligibility depends on points for affordability, energy efficiency or accessibility, and on lender approval.

Do I need multi-unit experience to get CMHC financing?

CMHC standard rental insurance asks for proven competence, at least five years of multi-unit property management experience or a property manager with that record.

Are fiveplex units exempt from development charges?

Toronto exempts units two through six in developments of up to six units, effective July 24, 2025.

Does a fiveplex qualify for the HST rental rebate?

It can, if the units are self-contained long-term rentals and the CRA conditions on timing and use are met.

What if my lot is outside the nine wards?

A fiveplex usually needs a minor variance or other approval. The Committee of Adjustment must find all four Planning Act tests are met.

How long does a fiveplex take?

Longer than a fourplex, mainly because of design, financing approval and, outside the nine wards, the variance process. We give a lot-specific schedule in feasibility. Typical SIXPLEX timelines: [Timeline STATS TBD].

The offer

The Lot Feasibility Review.

Send an address. Get back the truth about your lot.

What zoning allows: units, height, depth, suites
A build-cost range and a rent range for your lot
Financing paths and rebates you may qualify for
A straight recommendation — including “don’t build”

[Price / guarantee: TBD]