The biggest as-of-right move in Toronto low-rise. If your lot qualifies, nothing else comes close. If it doesn’t, we’ll tell you that too.

Where can I build a sixplex in Toronto?

As of June 26, 2025, By-law 654-2025 permits five- and six-unit detached multiplexes as-of-right on Neighbourhoods-designated low-rise lots in Wards 4, 9, 10, 11, 12, 13, 14, 19 and 23. Everywhere else the as-of-right cap is four units, so a sixplex needs a Committee of Adjustment application or a ward opt-in. We check this first.

Why build six units instead of four?

Five-plus units can qualify for CMHC MLI Select, with up to 95% loan-to-cost and up to 50-year amortization at 100 points. Toronto exempts development charges on units two to six, and four-plus qualifying rental units may recover the federal GST. Land, foundation and roof costs are shared across more rents.

How much does a sixplex cost to build in Toronto?

Altus Group puts GTA wood-frame hard costs at $210–$330 per square foot before land, soft costs and HST. ESTIMATE small infill multiplexes often land at $400–$600 per square foot all-in. Lot, servicing upgrades, basement depth and finish level move the number, so we price it during feasibility.

Is a sixplex ever the wrong choice?

Yes. Narrow or shallow lots, servicing limits, tree protection or a tight budget can make six units uneconomic. In those cases a fourplex plus a garden or laneway suite may deliver better returns with less risk. A good feasibility review should be willing to say "don’t build six."

What does the Lot Feasibility Review tell me?

Whether a sixplex actually works on your lot: what zoning allows, a cost range, a rent range, financing paths and rebates, and our recommendation. If something else on this list is the better move, we say so.

Deep dive

Where are sixplexes allowed in Toronto?

On June 25–26, 2025, City Council enabled residential buildings with up to six units in Toronto & East York District and Ward 23, and adopted a Multiplex Monitoring Zoning By-law. Under By-law 654-2025, five- and six-unit multiplexes are permitted in detached residential buildings on Neighbourhoods lots in Wards 4, 9, 10, 11, 12, 13, 14, 19 and 23. Elsewhere, six-unit permissions vary by location.

  • Ward 4 Parkdale–High Park
  • Ward 9 Davenport
  • Ward 10 Spadina–Fort York
  • Ward 11 University–Rosedale
  • Ward 12 Toronto–St. Paul’s
  • Ward 13 Toronto Centre
  • Ward 14 Toronto–Danforth
  • Ward 19 Beaches–East York
  • Ward 23 Scarborough North

Outside the nine wards?

You can still ask. A sixplex outside the permitted wards usually needs relief through the Committee of Adjustment, where every variance must pass the four Planning Act tests. It adds time, cost and risk, and the answer can be no. We tell you which side of that line your lot is on before you commit.

The sixplex money stack

  • Development charges: exempt on units two through six (Toronto, effective July 24, 2025).
  • Parkland: cash-in-lieu exempt for units two through six, or seven with a garden or laneway suite (By-law 845-2025).
  • GST/HST: six self-contained long-term rental units can qualify for the federal purpose-built rental rebate, plus Ontario’s provincial portion where federal conditions are met.
  • Financing: CMHC multi-unit insurance from five units, and MLI Select for qualifying projects (up to 95% loan-to-cost for new construction).

How big can a sixplex be?

The building still lives inside the zone’s height, lot coverage, setbacks and depth rules. Multiplex height is measured in metres, with a 10-metre floor where the overlay is lower, and the zone-label FSI doesn’t apply to multiplexes unless a Chapter 900 exception sets one. Six units in that envelope means small, efficient plans. Unit mix and layout decide rent, and rent decides whether the project works.

What drives sixplex cost?

We price every one of these for your lot in the feasibility pro forma. Sourced benchmarks are on the cost guide.

  • New construction is the norm. Few existing houses can absorb six units.
  • Fire separation, exits and sound between six households, under the 2024 Building Code.
  • Mechanical: per-unit heating, cooling and ventilation, and metering.
  • Site servicing: water service size and sanitary and storm capacity.
  • Lender requirements: cost consultants, progress draws and construction monitoring on insured loans.
  • Carry: interest during design, approvals and construction.

The sixplex process

  1. Check the zone. Look up your address on the City’s Interactive Zoning By-law Map. Multiplexes of two to four units are permitted in the R, RD, RS, RM and RT zones.
  2. Check the envelope. Height overlay, lot coverage overlay, setbacks and any Chapter 900 exception decide how big the building can be.
  3. Run the numbers. Build cost, soft costs, financing, rents and exit value, before a dollar goes into drawings.
  4. Design and engineer. Drawings, structure, mechanical and site servicing, prepared by qualified designers.
  5. Confirm zoning. Optional but recommended: a Zoning Applicable Law Certificate, so the permit application is complete on day one.
  6. Fix what doesn’t fit. If the design needs relief from zoning, apply for a minor variance at the Committee of Adjustment before the permit.
  7. Apply for the building permit through Toronto Building Online Services. Intake checks completeness, then an examiner reviews the plans.
  8. Build and inspect. Construction proceeds with City inspections at required stages.
  9. Occupy and lease. Final inspections, then tenants, a standard lease and a rent roll.

SIXPLEX projects of this type: [Project case studies & photos: TBD]

FAQ
Does a sixplex need a rezoning?

Not in the nine permitted wards if it fits the zoning envelope. Outside them, expect a Committee of Adjustment process.

Is a sixplex limited to detached houses?

By-law 654-2025 applies to detached residential buildings. Confirm your lot type in the by-law.

How long does a sixplex take?

Lot-specific. We give a schedule in feasibility. [Timeline STATS TBD]

Which Toronto wards allow sixplexes?

Wards 4, 9, 10, 11, 12, 13, 14, 19 and 23, in detached residential buildings on Neighbourhoods lots, under Zoning By-law 654-2025.

Can other wards opt in?

The City says six-unit permissions currently vary by location. We check the current status for your lot during feasibility.

Does a sixplex need a rezoning?

Not in the nine wards if it meets zoning standards. Outside them, or if it exceeds standards, it usually needs a minor variance.

Can I add a garden suite to a sixplex?

Toronto’s 2025 changes allow suites alongside more than three units, subject to the suite rules. By-law 845-2025 extends the parkland exemption to a seventh unit where there is a garden or laneway suite.

What financing works for a sixplex?

CMHC multi-unit insurance (five units or more) and MLI Select for projects that earn points. Lenders size the loan from the building’s income.

Are sixplex units rent-controlled?

Units in new buildings first occupied after November 15, 2018 are exempt from the annual rent increase guideline. Other Residential Tenancies Act rules still apply.

Do I need parking for a sixplex?

Toronto removed parking requirements for duplexes, triplexes and fourplexes in 2022. For five and six units, confirm the parking and bicycle parking rules in By-law 654-2025 for your lot.

The offer

The Lot Feasibility Review.

Send an address. Get back the truth about your lot.

What zoning allows: units, height, depth, suites
A build-cost range and a rent range for your lot
Financing paths and rebates you may qualify for
A straight recommendation — including “don’t build”