One lot.
Six homes.
Toronto changed the rules. Most owners still don’t know what their lot can hold. We show you the numbers before you spend a dollar.
What can I build on a Toronto lot?
Up to four units on residential lots city-wide. Up to six in a detached building in nine wards. A garden or laneway suite may also be possible. We check your lot before you spend on drawings.
Allowed on residential lots anywhere in Toronto.
As-of-right in Wards 4, 9–14, 19 and 23, in a detached building.
Development charges on units 2–6 in Toronto projects of up to six units.
What does SIXPLEX do?
We take a lot from zoning and numbers to finished, rented homes. Duplex to sixplex. Garden and laneway suites. The first deliverable is allowed to say don’t build.
How does a SIXPLEX project work?
Three moves. Numbers first. Drawings second. Build third.
Feasibility
Zoning, lot, servicing, rents, costs. You get a yes, a no, or a yes-if.
Design, permits, financing
Drawings and a pro forma side by side. As-of-right wherever we can. Packaged for lenders, including CMHC MLI Select for five units and up.
Build and lease-up
One team. One schedule. One number you can hold us to. Then occupancy and a rent roll. Timelines [STATS TBD].
Most people overpay because they under-learn.
So we give the playbook away. Sourced. Dated. No fluff.
How much does a multiplex cost?
Hard costs in the GTA benchmark at $210–$330 per square foot before land, soft costs and HST. Small infill often lands higher. We price your lot in feasibility — not as a website average.
Apartment and condo rents in Toronto rose 1.6% year over year, to $2,590, ending 32 months of annual declines.
GTHA purpose-built face rent. Condo rents were $3.83/sf. Same-building net rents were up 0.9% from Q2.
Before land, soft costs and HST. ESTIMATE small infill all-in often lands at $400–$600/sf.
Asking rents turned up. Costs are still high. The plan still has to work on paper first.
Where does SIXPLEX build?
Toronto and the GTA. Rules change by city. We start with your lot’s by-law, not a generic pitch.
Toronto
Up to 4 units city-wide. Up to 6 in nine wards.
Mississauga
Fourplexes as-of-right in certain low-rise zones.
Vaughan
Principal dwelling plus up to two additional units.
Markham
Provincial three-unit floor. Confirm the current by-law.
Brampton
City ARU page: maximum three units, including the main dwelling.
Richmond Hill
Up to four units in total, including the primary dwelling.
Follow the work.
Process, lots, and builds — when we have something real to show. No stock photos. No fake posts.
The Lot Feasibility Review.
Send an address. Get back the truth about your lot.
[Price / guarantee: TBD]
