Feasibility review
GTA · Toronto

Multiplexes in Toronto.

Four units city-wide; up to six in Wards 4, 9–14, 19 and 23. Garden and laneway suites in most residential zones. DCs exempt on units 2–6.

What can I build on a lot in Toronto?

Four units city-wide; up to six in Wards 4, 9–14, 19 and 23. Garden and laneway suites in most residential zones. DCs exempt on units 2–6. We confirm your exact lot during feasibility.

Does a multiplex make sense in Toronto?

It depends on land value, lot size, servicing and local rents. Province-wide, three units are allowed on serviced urban lots, and four or more qualifying rental units may unlock the federal GST rebate. We run a pro forma for your Toronto lot before recommending any unit count.

Compare GTA rules →

Deep dive

What can I build in Toronto, in one list?

  • Duplex, triplex or fourplex in the R, RD, RS, RM and RT zones, new or converted, city-wide.
  • Fiveplex or sixplex in detached buildings on Neighbourhoods lots in Wards 4, 9, 10, 11, 12, 13, 14, 19 and 23.
  • One garden suite or one laneway suite per lot, never both, including alongside a multiplex where the rules are met.

How do I check my own lot?

  1. Search your address on the City’s Interactive Zoning By-law Map to find the zone.
  2. Turn on the Height overlay. If it shows less than 10 metres, a multiplex may still go to 10 metres; if it’s 10 metres or more, that limit applies.
  3. Turn on the Lot Coverage overlay. Coverage limits still apply to multiplexes.
  4. Read the zone label. A “d” FSI value does not apply to multiplexes, but an “(x)” Chapter 900 exception may.
  5. Look for trees 30 cm or larger and any public lane along the rear or side.
  6. Call Toronto Building at 416-397-5330 with zoning questions, or apply for a Zoning Applicable Law Certificate.

What fees will I still pay in Toronto?

Development charges are exempt on units two through six in projects of up to six units (since July 24, 2025), and parkland cash-in-lieu is exempt on the same units under By-law 845-2025. You still pay the zoning certificate fee if you use one, building permit fees by floor area, the municipal road damage deposit for exterior work, and the real costs of water, sewer and electrical upgrades.

Toronto permit process, step by step

  1. Check the zone. Look up your address on the City’s Interactive Zoning By-law Map. Multiplexes of two to four units are permitted in the R, RD, RS, RM and RT zones.
  2. Check the envelope. Height overlay, lot coverage overlay, setbacks and any Chapter 900 exception decide how big the building can be.
  3. Run the numbers. Build cost, soft costs, financing, rents and exit value, before a dollar goes into drawings.
  4. Design and engineer. Drawings, structure, mechanical and site servicing, prepared by qualified designers.
  5. Confirm zoning. Optional but recommended: a Zoning Applicable Law Certificate, so the permit application is complete on day one.
  6. Fix what doesn’t fit. If the design needs relief from zoning, apply for a minor variance at the Committee of Adjustment before the permit.
  7. Apply for the building permit through Toronto Building Online Services. Intake checks completeness, then an examiner reviews the plans.
  8. Build and inspect. Construction proceeds with City inspections at required stages.
  9. Occupy and lease. Final inspections, then tenants, a standard lease and a rent roll.

Toronto rules change. How we keep up

Toronto has changed multiplex, suite and fee rules several times since 2022, and the City runs monitoring programs that can lead to more changes. Every rule on this site is sourced and dated. We re-check the official source for your lot during feasibility.

FAQ

More questions.

Can I build a fourplex anywhere in Toronto?

Four-unit multiplexes are permitted city-wide, subject to zoning standards and building permits.

Do Toronto multiplexes need parking?

Duplexes, triplexes and fourplexes have not required parking since February 3, 2022.

Who do I call about zoning for my lot?

Toronto Building zoning staff at 416-397-5330, 8:30 a.m. to 4:30 p.m. on weekdays, or apply for a Zoning Applicable Law Certificate.

Is the Zoning Applicable Law Certificate fee wasted if I then apply for a permit?

No. When you apply for the building permit using the certificate, its fee is credited against the permit fees.

Can a minor variance be refused?

Yes. The Committee of Adjustment must find that all four Planning Act tests are met, and each variance must satisfy all four.

Does Toronto charge development charges on a garden suite?

They can be deferred for 20 years under the laneway and garden suite DC deferral program.

The offer

The Lot Feasibility Review.

Send an address. Get back the truth about your lot.

What zoning allows: units, height, depth, suites
A build-cost range and a rent range for your lot
Financing paths and rebates you may qualify for
A straight recommendation — including “don’t build”

[Price / guarantee: TBD]