Feasibility review
2 homes · Toronto & GTA

Two homes. One address.

The cheapest door into multiplex living. One rent can cover a big piece of the mortgage. But a duplex is a different equation than a fourplex — know which one you are actually running.

Can I build a duplex in Toronto?

Yes. Ontario allows up to three units as-of-right on serviced urban residential lots, and Toronto permits up to four units in a multiplex on residential lots city-wide. A duplex sits comfortably inside both rules. Your zone still controls height, depth and setbacks, so confirm the envelope for your lot before you design.

Should I convert my house or build new?

Convert when the structure, foundation and basement ceiling height are sound and the layout splits cleanly. Build new when the house is near end of life or a new envelope fits far more floor area. A conversion is usually faster and cheaper per project; a new build usually wins on cost per square foot of finished space.

Does a duplex qualify for the GST/HST rental rebate?

No. The federal purpose-built rental rebate requires at least four qualifying units, and CRA specifically excludes duplexes. If tax recovery matters to your numbers, compare a duplex against a fourplex on the same lot. Additional second and third units are exempt from development charges under provincial rules, which helps.

What does a duplex cost in Toronto?

It depends on conversion versus new build, basement work and servicing. As a benchmark, Altus Group puts GTA wood-frame hard costs at $210–$330 per square foot before land, soft costs and HST. Small infill projects often land higher. We price your specific lot during the Lot Feasibility Review, not on a web page.

What does the Lot Feasibility Review tell me?

Whether a duplex actually works on your lot: what zoning allows, a cost range, a rent range, financing paths and rebates, and our recommendation. If something else on this list is the better move, we say so.

Deep dive

What counts as a duplex in Toronto?

Toronto’s zoning treats a duplex as a multiplex: a residential building with two units where at least one unit is entirely or partially above the other. Two units side by side is a different building type — usually a semi-detached house — with different standards.

You can get there two ways. Convert the house you already own by adding a second unit, often in the basement. Or demolish and build a new two-unit building from scratch.

Convert or build new?

Conversion keeps the structure you already paid for. The trade-off is that the old house sets the limits: ceiling heights, the foundation, existing plumbing runs and how much fire separation and sound control you can fit between units.

  • Convert when the basement height, structure and services can be brought up to code without rebuilding the house.
  • Build new when the house is near the end of its life, or when the envelope allows far more floor area than you have today.
  • Look past two units either way. A fourplex is permitted city-wide, so a duplex design should never block a bigger plan you may want later.

A new build gives you the full zoning envelope and a modern building, but adds demolition, more design and a longer path to rent. The right answer is lot-specific. That is exactly what feasibility is for.

What does the City need for a duplex permit?

A permit to convert a house into a duplex needs a full drawing set. Toronto’s multiplex conversion guide lists a site plan referenced to a current survey, fully dimensioned floor plans for every level (including smoke alarms, carbon monoxide detectors and plumbing fixtures), building sections, and construction details and notes. Applications go in through Toronto Building Online Services. Intake checks completeness first; then an examiner reviews the plans.

What drives the cost of a duplex?

We don’t publish a website average because the spread is too wide to be useful. These are the line items that move the number most:

  • Basement work: lowering the floor or underpinning to reach livable height.
  • Fire separation and sound control between units.
  • Heating and cooling: shared system with proper separation, or separate systems per unit.
  • Plumbing and drains: new fixtures, venting and the sanitary connection.
  • Water service and electrical service upgrades for two households.
  • Design, engineering and the City’s permit fee, charged per square metre. Toronto lists $18.56/m² for single-family dwellings, semis, townhouses and duplexes, effective Jan 1, 2026.

How do people finance a duplex?

Most duplexes are financed as residential property. CMHC’s homeowner insurance covers owner-occupied properties with one to four units, with up to 95% loan-to-value on one- to two-unit purchases.

If you already own the house, CMHC Refinance lets homeowners refinance to build a self-contained secondary suite. It is capped at 90% of the as-improved value and up to four units including the existing ones. The as-improved value must be below $2,000,000 and amortization can run up to 30 years. You or a close relative must live there, the suite can’t be a short-term rental, and CMHC approval must come before construction starts or at an early stage.

Is a new duplex unit rent-controlled?

Ontario’s rent increase guideline does not apply to most new units in existing houses that were completed after November 15, 2018. If there is a dispute, the landlord has to prove the date and also show that the unit was built in previously unfinished space, such as a basement or attic, or that the owner lived in another part of the house when the new unit was first occupied. Keep the permits, plans, invoices and before-and-after photos. Most tenancies must use Ontario’s standard lease.

Should you stop at two?

Maybe not. Toronto exempts development charges on units two through six in projects of up to six units. The federal GST/HST rental rebate excludes duplexes and triplexes and only starts at four qualifying units. If your lot can carry four, run that pro forma before you lock in two.

SIXPLEX projects of this type: [Project case studies & photos: TBD]

FAQ
Is a basement apartment a duplex?

In everyday use, yes — a house with a legal second unit is often called a duplex. Legally what matters is that the second unit meets the Building Code, fire separation and zoning for your property.

Do I need a permit to add a second unit?

Yes. Creating a new dwelling unit requires a building permit in Ontario, even inside an existing house.

Do I need parking for a duplex in Toronto?

No. Since February 3, 2022, duplexes, triplexes and fourplexes are not required to provide parking. If you choose to provide it, it must meet the Zoning By-law standards.

Can a duplex have two front doors?

Yes. Multiplexes may have multiple front entrances. The multiplex by-law amendment (By-law 474-2023) also removed the front-entrance restrictions for secondary suites.

Do I need a building permit to add a basement unit?

Yes. Converting a house into a duplex requires a building permit with a site plan, floor plans, sections and construction details.

Can I add a garden or laneway suite to a duplex?

Often, yes. Toronto allows a garden or laneway suite on the same property as a multiplex if the regulations are met, with a maximum of one ancillary building containing a suite per lot.

Do I pay development charges on a duplex in Toronto?

Toronto exempts development charges on the second through sixth unit in residential developments of up to six units, effective July 24, 2025. Confirm your specific project with the City.

Which Building Code applies to a duplex permit today?

The 2024 Ontario Building Code, in force since January 1, 2025. All permit applications made from April 1, 2025 must use it.

What if a big tree is in the way?

Injuring or removing a private tree 30 cm or more in diameter needs a permit under Toronto’s Tree Protection By-law. Plan around protected trees early.

How long does a duplex take?

It depends on whether it is a conversion or a new build, how complete the drawings are at application, and whether you need a minor variance. We give you a lot-specific schedule in feasibility. Typical SIXPLEX timelines: [Timeline STATS TBD].

The offer

The Lot Feasibility Review.

Send an address. Get back the truth about your lot.

What zoning allows: units, height, depth, suites
A build-cost range and a rent range for your lot
Financing paths and rebates you may qualify for
A straight recommendation — including “don’t build”

[Price / guarantee: TBD]