Feasibility to keys.

Short answer

A Toronto multiplex moves through six stages: feasibility, design and pro forma, permits, financing, construction and lease-up. The order matters — numbers before drawings, permits before financing commitments. Timelines depend on lot, variances and City review; we give a lot-specific schedule in feasibility. [Timeline STATS TBD]

  1. What happens in feasibility?
  2. Do I need a minor variance?
  3. How long does a Toronto building permit take?
  4. When should I arrange financing?

What happens in feasibility?

We confirm zoning, ward permissions, the buildable envelope, servicing capacity, trees and access, then estimate build cost and rents. You get a yes, a no, or a "yes, if." This is the cheapest stage to kill a bad project, so it gets the most scrutiny before any design fees are spent.

Do I need a minor variance?

Only if the design exceeds the as-of-right envelope — height, depth, setbacks or coverage. Variances go to the Committee of Adjustment, which adds time and uncertainty. Our default is to design within as-of-right limits unless the extra units or space clearly justify the risk. Some projects genuinely need one.

How long does a Toronto building permit take?

It varies with completeness of the submission, complexity and City workload. Using pre-approved plans can shorten review for garden and laneway suites. We will not publish a generic number; instead we set a schedule for your project during feasibility and track it. [Timeline STATS TBD]

When should I arrange financing?

Talk to a broker during design, not after permits. Unit count decides the lending path: one to four units usually residential, five or more potentially CMHC MLI Select. Commitments to affordability or energy points shape the design, so the financing plan has to be settled before drawings are finalized.

Sources

Accessed Nov 16, 2026. General information, not legal, tax or financing advice.

Deep dive

What makes a timeline longer?

What makes it shorter: complete drawings, a Zoning Applicable Law Certificate before the permit, and a design that fits the envelope as-of-right.

  • A minor variance: a Committee of Adjustment application, notice and hearing before the permit.
  • Incomplete drawings: the City notifies you and the application waits for resubmission.
  • Changes to pre-approved suite plans: any change voids the pre-approval.
  • Financing approvals: insured multi-unit loans add lender and CMHC review.
  • Trees: permits and protection plans.
  • Construction access, weather and inspection scheduling.
FAQ

More questions.

Can I start building before the permit?

No. Construction needs a building permit, and CMHC insured financing for a suite must be approved before construction or at an early stage.

The offer

The Lot Feasibility Review.

Send an address. Get back the truth about your lot.

What zoning allows: units, height, depth, suites
A build-cost range and a rent range for your lot
Financing paths and rebates you may qualify for
A straight recommendation — including “don’t build”